NDT INSPECTION AND CENTRALISER BRACELET INSTALLATION – WHP
NDT INSPECTION
CENTRALISER BRACELET INSTALLATION – WHP
Location
Maari Field, New Zealand
Principal
MODEC/OMV
Period
November 2016 - February 2017
Air Diving and NDT Services; Scope 1: Inspection areas inclusive of Jacket – chords and framing, I-Tubes – clamps and supports, Conductors – guides and supports and Caissons. Removal of marine bio-fouling from structure to -18m. Surface preparation of weld seams and member exposure for NDT inspection. Supply and undertaking of FMD, ACFM, CP and MPI inspections. Project and inspection reporting. Scope 2: Installation of two 240kg steel bracelets on centralizer line to depth of -29m.
No LTI’s, 13,063 minutes of BT, 14 personnel