REMEDIAL REPAIR - WHP

  Location Maari Field, New Zealand 
  Principal  MODEC/OMV
  Period June 2018 - August 2018

 

Air Diving and NDT Services; Remedial repair inclusive of cutting subsea horizontal member. Removal of anodes struts and doubler plate to fit engineered clamps. Gather metrology data for permanent clamp design of target locations. Installation of three temporary clamps and rigging to support member.

No LTI’s, 4,217 minutes of BT, 9 personnel